1. How much does it cost to rent a concrete mixing station
A concrete mixing station is a construction machinery and equipment for producing concrete. The cost of investing in a concrete mixing station is relatively high. If If it is a short-term need, you can consider leasing a concrete mixing plant. So how much does it cost to rent a concrete mixing plant?
The rental cost of a concrete mixing station is not fixed. It is generally based on its specifications, production scale, city, etc. Some are rented by month, some are rented by year, and some are rented by the number of concrete units produced. For renting, the specific fees vary. Generally, if you rent on a monthly basis, the monthly rental fee is about 10,000 to 30,000 yuan. (The above information comes from the Internet, for reference only)
2. How to write a lease contract for a concrete mixing station
The cost of leasing a concrete mixing station is not low. In order to protect the rights and interests of both parties, there are It is necessary to sign a lease contract. Here is a sample of the lease contract for a concrete mixing station:
Party A:
Party B:
Party A agrees after negotiation Lease Party B’s ________ concrete mixing station. In order to clarify the responsibilities and obligations of Party A and Party B, this contract is specially formulated for both parties to abide by.
(1) Party B will lease a set of ________ concrete mixing station (excluding building materials) to Party A and ensure the integrity and integrity of the equipment to meet Party A’s requirements.
(2) The quality of concrete is jointly controlled by Party A and Party B. Party A issues the concrete construction mix ratio, which is strictly implemented by Party B to ensure that the concrete is smoothly transported to the specific work location. Party B shall actively cooperate with Party A in adjusting the mix ratio, sampling and other work according to the construction requirements. Party A shall be responsible for the inspection fees and delivery of incoming materials and concrete test blocks. The staff and expenses shall be borne by Party B.
(3) Equipment rental unit price: ________ yuan per cubic meter of concrete. (This fee does not include any building materials such as concrete delivery agents, admixtures, water-reducing agents, waterproofing agents, expansion agents, etc.) No pumping agents are added to the concrete (except waterproof concrete).
(4) Settlement method: The amount of concrete shall be based on the computer measurement of the mixing station. The quantity of concrete poured each time must be signed and approved by Party A, otherwise it will be invalid.
(5) Payment method: After signing the contract, Party A will pay 10,000 yuan in advance for the project after Party B’s equipment arrives at the site. Party B’s equipment must be placed on site before _________year____month____ , the cubic meter volume of the mixing station will be counted on ____ day of each month, and 50% of the rental price of the previous month will be settled and paid before ____ day of the next month. The remaining balance will be paid within one month after the mixing station is dismantled.
(6) Party B has the right to stop production due to Party A’s failure to pay funds on time. Due to the suspension of work for one month due to Party A’s reasons, Party A needs to pay Party B an additional equipment rental fee of nearly one month beyond the one-month construction period. (7) Party B is responsible for entering and exiting the site.
(8) Party B is responsible for the disassembly, assembly and cleaning of pump tubes, the delivery of on-site additives and corresponding cooperation.
(9) After Party B enters the site, Party A is responsible for providing three connections and one leveling, and the cost shall be borne by Party A. Party A is responsible for production water and electricity charges.
(10) Party A is responsible for providing an office and warehouse for Party B.
(11) The equipment provided by Party B must ensure normal use and fully meet Party A’s construction progress requirements. It must be able to be used as needed and the construction period cannot be delayed for 24 hours due to equipment reasons. If the on-site construction period is stopped or the construction period is delayed for any reason, Party A will be punished at the rate of _______ yuan/day.
(12) Party B’s staff must obey the instructions of Party A’s project department management personnel when entering Party A’s construction site.
(13) Party B must strictly abide by the safe operating specifications and procedures required by the state and the construction site for equipment.
(14) When Party B enters Party A’s construction site, it is obligated to coordinate Party A’s on-site safe and civilized construction work.
(15) The main construction period of ________ is from ____ year ____ month ____ to _____ year ____ month ____ day.
(16) Party B must have two shifts of operators to ensure that concrete can be poured at any time.
(17) Unfinished matters shall be resolved through friendly negotiation between the two parties.
(18) This contract is made in four copies and will take effect after signature, two copies for each party. The termination date of this agreement is when all funds are fully settled.
Party A: Party B:
Person in charge: Person in charge:
Person in charge: Person in charge:
____ year ____month____day____year____month____day